The project will focus on priority steps in the reform process and target the following areas: (i) designing regulatory and institutional reforms for the power sector, (ii) developing a roadmap for establishing...
A key issue for the electricity sector development in Libya is the availability and reliability of less costly fuels such as natural gas. Thus, General Electricity Company of Libya (GECOL) is looking for...
The feasibility study in hand is part of a larger set of tasks to analyse the Libyan market for the implementation of utility scale renewable energy producers into the national grid system. Under this...
The following report provides an introduction to the different procurement mechanisms and structures for Private Sector Participation (PSP) in the energy market. Chapter two provides an overview on some...
The document constitutes the fuel availability and opportunities for cost reduction report included in task B. The objective of this report is to review the natural gas and electricity markets to determine...
The manpower and organizational rationalization review report is the fifth deliverable of Task C. The next sections will focus on the analysis of the issues identified in the rapid assessment report and...
GECOL has some 26 power stations containing 85 generating units of various sizes, technologies, and ages distributed around Libya, with the majority along Libya’s Mediterranean coastline. This report aims...
This report focuses on five key processes, functional to help General Electricity Company of Libya (GECOL) responding to the issues identified with Task A (Rapid sector assessment). The process mapping...
The goal of this review is to narrow down the many solar and wind technologies available to most suitable for the least cost expansion plan (LCEP). The main objective of the LCEP is to establish an optimized...
Initially, the Consultant task was to develop a grid code document for connecting such onshore renewable energy projects to the Libyan power system, which we considered in other parts of the project as...
The least cost expansion plan (LCEP) analysis is the first step towards the preparation of a strategic plan for renewable energies in Libya (SPREL). This report describes the methods, assumptions, processes...
The present document is the final deliverable of the Task C . Task C report is organized in six sections, each one related to one deliverable of the project: institutional development, processes, manpower...
The present document is the final report of the task A: it includes the project review and the related recommendations. The executive summary includes: summary of key issues faced by the electricity sector...
Enterprise resource planning (ERP) system review is the fourth and final part of the institutional development phase of task C. The ERP system review intends to perform a review of the current ERP system...
The present report focuses on the sector restructuring roadmap and the related inputs for the Electricity Act. This document describes the sector reform plan for Libya, focusing mostly on the Institutions-led...
The present report focuses on detailing the options for the establishment of the Libyan electricity regulator (LEMRA). To design the establishment of the LEMRA author have focused on three dimensions:...
The objective of this paper is to rapidly identify the issues affecting the sector, revise the libyan electricity demand towards 2030, review the libyan electricity sector, by business area (generation...
The focus of this report is the phase three of task C, focused on the financial performance assessment and financial models. The deliverables have been combined in a comprehensive presentation and an excel-based...
The document is focused on the institutional development of GECOL task C, project approach and current report focus.
The objective of this paper is to rapidly identify the issues affecting the sector, revise the libyan electricity demand towards 2030, review the libyan electricity sector, by business area (generation...