Turkey - Third TEK Transmission Project (Английский)

Подробная Информация

  • Дата подготовки документа

    1991/12/31

  • Тип документа

    Отчет о завершении проекта

  • Номер отчета

    10257

  • Том

    1

  • Total Volume(s)

    1

  • Страна

    Türkiye,

  • Регион

    Европа и Центральная Азия,

  • Дата раскрытия информации

    2010/06/18

  • Disclosure Status

    Disclosed

  • Название документа

    Turkey - Third TEK Transmission Project

  • Ключевые слова

    transmission line;long run marginal cost;marginal cost of supply;internal cash generation;lack of commitment;construction and operation;technical training program;kv transmission line;independent regulatory authority;rights of way;lack of autonomy;distribution enterprise;demand management;technical assistance efforts;award of contract;net working capital;state economic enterprise;power transmission grid;weights and measure;interest during construction;negative environmental impact;cash generation covenant;air quality impact;price of power;energy conservation study;fuel cost adjustment;financial reporting;data processing;tariff increase;urban distribution;power utility;power utilities;institution building;manpower planning;engineering consultant;currency funds;local funds;tariff study;public power;local costs;institutional objectives;kv line;power station;revolving fund;contracting procedure;financial difficulties;international market;hydropower station;restructuring program;load management;staff development;commercial company;construction work;front-end fee;project costing;strategic approach;capital expenditure;power industry;financial statement;competitive basis;tariff design;physical facility;utility function;financial strategies;financial strategy;institutional weakness;transmission network;financial targets;account receivable;electricity sale;investment program;supply increase;official rules;meter reading;gigawatt hour;management structure;staff resource;international accounting;cubic feet;management consultant;exchange rate;incremental revenues;operational problems;transmission system;management improvement;financial ratio;sound accounting;local engineering;generation capacity;electricity tariff;financial cost;kilowatt hour;future asset;short circuits;study including;steady state;emergency conditions;foreign costs;hydro plant;billing system;generation expansion;water level;administrative improvement;financial weakness;distribution asset;administrative problem;bank's guidelines;power tariff;municipal power;inventory control;Exchange Rates;electricity distribution;transmission phase;long range;active duty;hydroelectric reservoir;local contractor;technological change;Cash flow;tariff adjustment;pilot program;hydro dam;lattice tower;power system;Energy Sector;adjustment program;construction drawing;kv substation;social infrastructure;foreign expenditure;consulting contract;software package;guarantee agreement;fuel adjustment;Electric Power;accounting practice;bank for review;debt service;accounting staff;high inflation;increasing costs;international auditing;bank participation;foreign exchange;distribution activity;

Файлы Для Скачивания

ПОЛНЫЙ ОТЧЕТ

Официальная версия документа (может содержать подписи, и т.д.)