The Second Railway Project will consist essentially of: (a) track and buildings: (i) equipment for and renewal of 21.5 km of track; (ii) ballasting of 210 km of line; (iii) joint welding of 380 km of rails; and (iv) minor repairs to bridges; (b) motive power and rolling stock: 4 main line locomotives; 5 shunting locomotives; 2 railcars; 8 trailers; 4 passenger coaches; 125 freight cars and spare parts for rolling stock; and (c) management: equipment...
Подробнее
Document also available in :
Французский
ПОДРОБНАЯ ИНФОРМАЦИЯ
-
1973/04/30
-
Отчет персонала об оценке проекта
-
32
-
1
-
1
-
2010/06/18
-
Disclosed
-
Mali - Second Railway Project
-
Traffic