Skip to Main Navigation

Tanzania - Second Highway Project (Английский)

The proposed project consists of (i) the realignment and reconstruction to two-lane asphalt paved standard of the existing earth/gravel sections of the Ten-Zam Highway from a point 38 miles west of Morogoro to Mahenge (a length of 102 miles) including the Ruaha River bridge at Mauyuni, and from Iringa to Iyayi (a length of 125 miles); (ii) the reconstruction to two-lane asphalt paved standard of the existing paved but low standard sections of the...
Подробнее

ПОДРОБНАЯ ИНФОРМАЦИЯ

ФАЙЛЫ ДЛЯ СКАЧИВАНИЯ

ПОЛНЫЙ ОТЧЕТ

Официальная версия документа (может содержать подписи, и т.д.)

This document is being processed or is not available.