Skip to Main Navigation

Mali - Second Railway Project (Английский)

The proposed project would consist essentially of: (a) track and buildings: (i) equipment for and renewal of 21.5 km of track; (ii) ballasting of 210 km of line; (iii) joint welding of 380 km of rails; and (iv) minor repairs to bridges; (b) motive power and rolling stock: 4 main line locomotives; 5 shunting locomotives; 2 railcars; 8 trailers; 4 passenger coaches; 125 freight cars and spare parts for rolling stock; and (c) management: equipment for...
Подробнее

ПОДРОБНАЯ ИНФОРМАЦИЯ

ФАЙЛЫ ДЛЯ СКАЧИВАНИЯ

ПОЛНЫЙ ОТЧЕТ

Официальная версия документа (может содержать подписи, и т.д.)

This document is being processed or is not available.