The proposed loan would cover part of the foreign exchange costs of a project to construct the second stages of the Prai and the Port Dickson Thermal Stations and associated transmission facilities.
Подробнее
ПОДРОБНАЯ ИНФОРМАЦИЯ
-
1968/12/31
-
Отчет персонала об оценке проекта
-
TO697
-
1
-
1
-
2010/06/18
-
Disclosed
-
Malaysia - Fourth Power Project
-
allocation of capital cost
ФАЙЛЫ ДЛЯ СКАЧИВАНИЯ
ПОЛНЫЙ ОТЧЕТ
Официальная версия документа (может содержать подписи, и т.д.)