Skip to Main Navigation

Restructuring Integrated Safeguards Data Sheet - Vietnam Road Asset Management Project - P123961 (Английский)

Подробная Информация

  • Автор

    Tran,Phuong Thi Minh

  • Дата подготовки документа

    2020/12/25

  • Тип документа

    Сводный перечень данных о гарантиях

  • Номер отчета

    ISDSR30381

  • Том

    1

  • Total Volume(s)

    1

  • Страна

    Вьетнам,

  • Регион

    Восточная Азия и страны Тихоокеанского региона,

  • Дата раскрытия информации

    2020/12/25

  • Disclosure Status

    Disclosed

  • Название документа

    Restructuring Integrated Safeguards Data Sheet - Vietnam Road Asset Management Project - P123961

  • Ключевые слова

    monitoring and evaluation system; Environmental and Social Impact; Land Acquisition and Resettlement; improvement of road safety; health and safety issue; air pollution from vehicle; safeguard policy; Safeguard Policies; adverse environmental impact; loss of land; flora and fauna; amount of land; ethnic minority population; ethnic minority groups; transportation of materials; agriculture and forestry; mobilization of worker; loss of crop; forest fire risk; vehicle operating cost; road asset management; contamination of soil; disposal of waste; social and environmental; physical cultural resources; use of pesticide; generation of waste; critical natural habitats; road maintenance contract; social safeguard policy; mitigation measure; road section; environmental monitoring; natural reserve; public consultation; household affect; resettlement plan; pavement strengthening; construction supervision; civil works; protected area; resettlement implementation; positive impact; biodiversity areas; safeguard issue; Social Assessment; monitoring plan; quality review; reporting requirement; buffer zone; national legislation; road condition; delivery time; common cold; Forest Management; Performance Standards; adequate hygiene; utility service; crop production; worker safety; construction activities; pollution risk; construction site; Traffic Safety; social disturbance; project impact; cultural site; institutional measure; government approval; road alignment; steep slope; vehicle operation; land area; national highway; existing dam; connecting road; irreversible impacts; illegal hunting; public place; forest land; Energy Projects; Project Monitoring; external monitoring; compensation plan; hydropower plant; program development; resettlement fund; mountainous area; management board; compensation rate; displaced people; monitoring indicator; environment assessment; residential area; counterpart funding; environmental performance; safeguards data; personal protection; safeguard analysis; traffic artery; impact survey; compensation policy; recent experiences; physical characteristic; cultural exchange; residential land; productive land; resettlement policy; national defense; foreign affair; environmental compliance; institutional responsibilities; local ngo; traffic condition

Файлы Для Скачивания

ПОЛНЫЙ ОТЧЕТ

Официальная версия документа (может содержать подписи, и т.д.)