The Second TEK Power Transmission Project comprises: (a) the construction of 21 substations being part of the development plan of the Turkish Electricity Authority (TEK) for the period 1975 to 1979; (b) engineering services and designs; (c) the training for TEK engineers and training equipment; (d) a study of the power tariff structures; (e) the construction of 755 km of 380 and 154 kV transmission lines; and (f) a study of TEK's personnel staffing...