Skip to Main Navigation

Gambia - Energy Project (Английский)

The project would assist the Government in developing a strategy for accelerating hydrocarbon exploration in the country and in strengthening the electric power sector. It would also support the government's efforts to make better use of its forest resource. The project would include: (a) an exploration promotion component comprising: (i) the retrieval, re-evaluation and test reprocessing of seismic data and the strengthening of the government's geological unit (20 man-months); (ii) a review of the contractual framework for petroleum exploration and assistance in negotiations with private oil companies (6 man-months); (iii) training of one staff member of the geological unit, and (iv) office and field equipment; (b) a power distribution component that would include investments to improve GUC's distribution network in the Banjul/Kombo/St. Mary area; (c) a forestry component that would assist the govenment to strengthen the Forestry Department and to develop an energy-related program.

Подробная Информация

  • Дата подготовки документа

    1981/10/31

  • Тип документа

    Доклад Президента

  • Номер отчета

    P2971

  • Том

    1

  • Total Volume(s)

    1

  • Страна

    Гамбия,

  • Регион

    Африка,

  • Дата раскрытия информации

    2010/06/24

  • Disclosure Status

    Disclosed

  • Название документа

    Gambia - Energy Project

  • Ключевые слова

    water and sewerage service;demand for petroleum product;small and medium enterprise;negative rate of return;price petroleum product;petroleum exploration;geophysical data;basin study;foreign expenditure;foreign exchange risk;private oil companies;balance of payment;oil exploration license;generating capacity;power station;exploration contract;petroleum product consumption;cost of import;condition of effectiveness;debt limitation covenant;economic growth rate;price of gasoline;average living standard;public finance situation;net foreign exchange;agricultural marketing organization;minimum liquidity requirements;Trade and Transport;trade and transportation;fuel oil price;livelihood from agriculture;supply of electricity;seismic reflection survey;infrastructure and services;vulnerability to drought;increase in population;production of hydrocarbon;long term risk;local competitive bidding;water supply system;long term debt;domestic energy resource;agricultural extension service;sewage treatment facility;production and export;local cost financing;loss of revenue;kv transmission line;peak load period;development of tourism;renewable energy resource;debt service obligation;technical assistance program;source of revenue;electric power system;electric power distribution;water and electricity;lack of staff;cost of energy;procurement and disbursement;Oil and Gas;electric power sector;total energy consumption;agriculture and service;local food production;Oil & Gas;wood consumption;contractual framework;financial situation;absorptive capacity;power supply;forestry resource;Energy Sector;energy planning;oil company;Rural Sector;forestry sector;diesel generator;groundnut production;continental shelf;government administration;hydrocarbon discovery;petroleum import;investment program;power facility;license term;Public Utilities;retail price;distribution network;commercial bank;separate account;rural population;field equipment;urban population;hydrocarbon exploration;local expenditure;agricultural production;financial problem;forestry institution;hydrocarbon potential;seismic data;foreign assistance;industrial activity;foreign donor;peak demand;installed capacity;kv line;legal consultant;cattle production;farm land;fallow land;Short Term Assignment;external aid;distribution facility;soil erosion;food crop;irrigation development;heavy investment;wood supply;project datum;voltage line;government body;power tariff;small-scale enterprise;wood burning;wood energy;distribution component;mineral production;system breakdown;forestry planning;government plan;wood stove;improving management;grain storage;fuel cost;tree plantation;credit supply;feeder line;management personnel;effective policies;financial targets;food self-sufficiency;qualified technical;process plant;fixed asset;Fixed Assets;electricity sale;water component;water service;Water Services;forestry policy;annual increment;Wind Power;sewerage component;wooded area;pasture land;upland soil;water point;urban growth;project costing;climatic condition;food requirement;provincial power;urban household;project finance;bank group;water system;water-supply system;rational approach;foreign trade;institutional obstacles;sea level;foreign reserve;forest land;capital account;export performance;domestic credit;financial program;Agricultural Institution;qualified personnel;agricultural productivity;modern sector;agricultural sector;highway maintenance;cultivation method;real benefits;import substitution;manufacturing industry;local market;government revenue;Population Growth;constant price;export earnings;population pressure;legal framework;principal risk;oil import;Natural Resources;livestock raising;oil shale;financial reserve;petroleum demand;rice cultivation;swampy areas;qualified professional;budget cover;Geological Information;small country;rainy season;world market;budgetary subsidy;budgetary subsidies;hydroelectric potential;productive sector;cost elements;budgetary saving;working population

Файлы Для Скачивания

ПОЛНЫЙ ОТЧЕТ

Официальная версия документа (может содержать подписи, и т.д.)