The specific project components are as follows: (a) Interconnection: construction of about 145 km of a 230 kV transmission line for interconnection with Costa Rica. (b) Transmission: Construction of about 22 km of a 138 kV transmission line; construction, addition, and/or conversion of substations with about 122 MVA; relocation of about 75 MVA transformer capacity, and installation of protective and metering equipment; installation of about eight...
Подробнее
ПОДРОБНАЯ ИНФОРМАЦИЯ
-
1977/03/31
-
Отчет персонала об оценке проекта
-
1254
-
1
-
1
-
2010/06/18
-
Disclosed
-
Nicaragua - Ninth Power Project
-
united states agency for international development