The Second Phase of the Infrastructure and Local Development Program Project is implemented as part of a program known as Public Interest Works for the Promotion of Entrepreneurship and Employment (TIPPEE). As part of this project, it is planned to pave 1600 m of urban road-works between PK7 Road and Expressway 2 in Libreville (5th District). Negative aspects include: 1. Air pollution; 2. Risk of erosion and landslide; 3. Destruction of property located...
Подробнее
ПОДРОБНАЯ ИНФОРМАЦИЯ
-
2015/10/01
-
Оценка состояния окружающей среды
-
SFG1431
-
1
-
2015/10/19
-
Disclosed
-
Travaux de pavage de 1600 m de voierie urbaine entre la route du PK 7 et la voie express 2 (5eme arrondissement a Libreville)