The objectives of the Additional Financing for the Second National Drainage Project (NDPII) for Egypt are: (a) to increase the agriculture productivity of irrigated lands by improving drainage conditions through evacuation of excess irrigation water by subsurface drains; and (b) to avoid yield and production losses on this land, which will result if water logging and soil salinity problems were to persist. The additional loan will help finance the...
Подробнее
ПОДРОБНАЯ ИНФОРМАЦИЯ
-
2010/02/24
-
Документ о проекте
-
52887
-
1
-
2012/04/30
-
Disclosed
-
Main report
-
Accountability
ФАЙЛЫ ДЛЯ СКАЧИВАНИЯ
ПОЛНЫЙ ОТЧЕТ
Официальная версия документа (может содержать подписи, и т.д.)