The Sixth Salinity Control and Reclamation Project will provide for: (a) Construction of about 930 fresh groundwater tubewells and associated works for winter season irrigation and water table control. (b) Construction of about 250 saline groundwater tubewells to stabilize groundwater levels, a drainage disposal system, pumping stations and evaporation ponds; (c) An electrification network to energize all public tubewells and pumping stations on the...