The project aim is to improve the efficiency and quality of electricity supply through financing of critical investments for the supply and installation of a 160 ton per hour boiler at existing Al-Hiswah steam power station in Aden, de-bottlenecking of the transmission system, loss reduction programs and strengthening of the distribution systems among other rural energy access. If a resettlement action plan is required the plan must include the following...
Подробнее
Document also available in :
Арабский
ПОДРОБНАЯ ИНФОРМАЦИЯ
-
2005/08/01
-
План переселения
-
RP368
-
1
-
1
-
2005/11/14
-
Disclosed
-
Yemen - Power Sector Project : resettlement plan
-
Real estate