Ratings of Second Secondary and Local Roads Project for Georgia were as follows: outcome was moderately satisfactory, Bank performance was satisfactory, and monitoring and evaluation quality was substantial. Some of the lessons learned include: (i) the output and performance-based road contracting (OPRC) activity demonstrated the need for flexibility when undertaking a pilot project; (ii) the key pilot activity under the project was technically complex...
Подробнее
ПОДРОБНАЯ ИНФОРМАЦИЯ
-
2019/12/23
-
Отчет о завершении и результатах проекта
-
ICR4975
-
1
-
1
-
2019/12/30
-
Disclosed
-
Georgia - Second Secondary and Local Roads Project
-
secondary and local road