Skip to Main Navigation

Brazil - Projeto de Transporte Urbano do Sao Paulo : plano de acoes para realocacao da populacao e empresas (Vol. 3 of 4) : Anexos 2-9 : linha 4 Amarela : trecho Morumbi - Luz (Португальский)

This Resettlement Action Plan (RAP) for the Sao Paulo Integrated Urban Transport Project, covers mainly the reallocation impacts resulting from the construction of the subway's Yellow Line, segment Morumbi - Luz, which will link two important commercial areas: Pinheiros and Faria Lima, currently isolated by the natural barrier of the River Pinheiros. The RAP stipulates that although massive expropriations will be minimized, resettlement will occur...
Подробнее

ПОДРОБНАЯ ИНФОРМАЦИЯ

  • 2000/02/01

  • План переселения

  • RP72

  • 3

  • 4 (См. все тома)

  • Бразилия,

  • Латинская Америка и страны Карибского бассейна,

  • 2010/07/01

  • Anexos 2-9 : linha 4 Amarela : trecho Morumbi - Luz

  • Resettlement

This document is being processed or is not available.