Подробная Информация
-
Автор
-
Дата подготовки документа
2021/10/27
-
Тип документа
Документ о проекте
-
Номер отчета
RES48641
-
Том
1
-
Total Volume(s)
1
-
Страна
-
Регион
-
Дата раскрытия информации
2021/10/27
-
Disclosure Status
Disclosed
-
Название документа
Disclosable Restructuring Paper - Enhanced Road Access Project - P145545
-
Ключевые слова
road safety; road asset management system; run off the road; resilience to climate change; road and bridges; extreme weather event; contract signing; axle load limit; financial management arrangement; Investment Project Financing; single source procurement; main road network; road safety audit; climate resilience; road sector; traffic count; budget constraint; civil works; additional saving; variation order; available funds; construction specification; existing contract; financing instrument; asphalt concrete; road standard; field investigation; vehicle traffic; bridge work; new contract; topographic survey; procurement process; network traffic; bus stop; traffic speed; natural rock; safety barrier; rural area; heavy flood; project risk; high traffic; road access; fourth extension; Safeguard Policies; safeguard policy
- Подробнее
Файлы Для Скачивания
ПОЛНЫЙ ОТЧЕТ
Официальная версия документа (может содержать подписи, и т.д.)
- Официальная версия (PDF)
- TXT*
- Total Downloads** :
- Download Stats