Report summarizing the public consultations undertaken in March-April 2021 in relation to the ESIA for the Nunez- Tigre works Buenos Aires – Mitre Passenger Railway Line Modernization Project (P175138) (Испанский)

ПОДРОБНАЯ ИНФОРМАЦИЯ

  • 2021/05/26

  • Доклад/ отчет

  • 1

  • Аргентина,

  • Латинская Америка и страны Карибского бассейна,

  • 2021/05/26

  • Disclosed

  • Report summarizing the public consultations undertaken in March-April 2021 in relation to the ESIA for the Nunez- Tigre works Buenos Aires – Mitre Passenger Railway Line Modernization Project (P175138)

ФАЙЛЫ ДЛЯ СКАЧИВАНИЯ

ПОЛНЫЙ ОТЧЕТ

Официальная версия документа (может содержать подписи, и т.д.)

This document is being processed or is not available.