The Sugar Roads Project consists of (a) the detailed engineering and construction of 41 miles of bituminous surfaced and 4 miles of gravel surfaced main roads, of 118 miles of gravel surfaced feeder roads, and of 106 miles of gravel surfaced field access roads; and (b) the detailed engineering of an additional 40 miles of main roads, and 200 miles of feeder and field access roads to be constructed later. The primary purpose of the roads is to serve...