The Jaguara Power Project will assist in financing the Jaguara hydroelectric project (400 MW). The Power Distribution Project consists of a three-year portion of the Project Companies' five-year expansion programs comprising the rehabilitation and expansion of their transmission and distribution systems. About 20 to 25 percent of the total expenditures would be for rehabilitation. Facilities to be installed include high-voltage connecting lines and related substations, low-voltage distribution feeders and transformers and related distribution hardware such as switchgear, meters, etc. The Power Distribution Project consists of a three-year portion of the Project Companies' five-year expansion programs comprising the rehabilitation and expansion of their transmission and distribution systems. About 20 to 25 percent of the total expenditures would be for rehabilitation. Facilities to be installed include high-voltage connecting lines and related substations, low-voltage distribution feeders and transformers and related distribution hardware such as switchgear, meters, etc. The Power Distribution Project consists of a three-year portion of the Project Companies' five-year expansion programs comprising the rehabilitation and expansion of their transmission and distribution systems. About 20 to 25 percent of the total expenditures would be for rehabilitation. Facilities to be installed include high-voltage connecting lines and related substations, low-voltage distribution feeders and transformers and related distribution hardware such as switchgear, meters, etc. The Power Distribution Program Project consists of a three-year portion of the Project Companies' five-year expansion programs comprising the rehabilitation and expansion of their transmission and distribution systems. About 20 to 25 percent of the total expenditures will be for rehabilitation. Facilities to be installed include high-voltage connecting lines and related substations, low-voltage distribution feeders and transformers and related distribution hardware such as switchgear, meters, etc.
Подробная Информация
-
Дата подготовки документа
1966/12/05
-
Тип документа
Меморандум и рекомендации Президента
-
Номер отчета
P515
-
Том
1
-
Total Volume(s)
1
-
Страна
-
Регион
-
Дата раскрытия информации
2010/06/24
-
Disclosure Status
Disclosed
-
Название документа
Brazil - Power, Tranmission and Hydroelectric Projects
-
Ключевые слова
transmission and distribution system;negative real interest rate;balance of payment;federal holding company;revaluation of asset;market for power;debt service payment;debt service ratio;debt service obligation;event of default;demand for power;procurement of equipment;commercial interest rate;basis of information;system of price;source of financing;cost of equipment;cost equipment;multiple exchange rate;prospective borrower;power company;Fixed Assets;exchange reserve;import restriction;wage policy;wholesale price;price control;grace period;price stability;private investor;Economic Policy;domestic price;external indebtedness;Population Growth;industrial demand;cash deficit;reserve position;free market;Exchange Rates;legal redress;utility rate;real income;power rate;fair representation;aggregate cost;bank lending;low-voltage distribution;hold equity;autonomous entity;normal market;price inflation;bank claim;special interest;net operating;Electric Power;bank borrower;financial policies;adverse changes;tariff regime;power tariff;national power;distribution network;loan fund;investment program;investment process;appraisal reports;electricity rate;monetary program;coffee crop;gradual approach;external financing;
Подробнее
Файлы Для Скачивания
ПОЛНЫЙ ОТЧЕТ
Официальная версия документа (может содержать подписи, и т.д.)
- Официальная версия (PDF)
- TXT*
- Total Downloads** :
- Download Stats