The development objective of Corridor X Highway Project is to increase transport efficiency and improve traffic safety on the three project sections of Corridor X, between Nis and Dimitrovgrad and Grabovnica and Donji Neradovac respectively, and to improve road management and road safety in Serbia. This restructuring requires the following changes : (i) ensure Bank involvement in the remedial measures for a landslide located in Gradinje along the...
Подробнее
ПОДРОБНАЯ ИНФОРМАЦИЯ
-
2018/06/25
-
Документ о проекте
-
RES33163
-
1
-
1
-
2018/06/25
-
Disclosed
-
Disclosable Restructuring Paper - CORRIDOR X HIGHWAY PROJECT - P108005
-
remedial measure
ФАЙЛЫ ДЛЯ СКАЧИВАНИЯ
ПОЛНЫЙ ОТЧЕТ
Официальная версия документа (может содержать подписи, и т.д.)