The objective of the El-Ain Al-Sokhna 2x650 MWe Gas and Oil Thermal Power Project for Egypt is to identify the environmental and social impacts of construction and operation of the project. Negative measures include: noise, air pollution, water quality, solid and hazardous wastes, traffic and local roads, and flora and fauna. Mitigation measures include: (a) with respect to noise generated from ground traffic and equipment, the predication should...