This is the Implementation Completion Report (ICR) for the Yantan Hydroelectric Project in China. The objectives of the project were to: (a) help address the acute energy shortage in Guangxi autonomous region and Guangdong province through the cascade development of the Hongshui River; (b) promote interconnection within the South China grid; (c) help build relations with GEPB and the regional authority, South China Electric Power Administration (SCEPA), with whom the Bank expected to collaborate on future projects; (d) provide transfer of technology in dam design and construction; and (e) upgrade financial planning and management practices in the electricity subsector. The project achieved its primary objective of supporting economic growth through development of an important indigenous resource. Bank performance overall was satisfactory. The key lessons to be learned from this project are: 1) In a project such as Yantan, which relies heavily on local capabilities, it is important to guard against over-optimism with respect to these capabilities in areas where traditional Chinese hydroelectric implementation has not provided exposure to modem techniques and technology. In the context of China's rapid economic growth, it is also important to assess the manufacturing capacity and workload of local suppliers and thus their capability to deliver on time; 2) In the area of resettlement, the key lesson learned is that for a large resettlement project such as Yantan, it is important that project preparation in relation to resettlement be at least as detailed as that of the construction component.
Подробная Информация
-
Дата подготовки документа
1995/06/30
-
Тип документа
Отчет о завершении и результатах проекта
-
Номер отчета
14773
-
Том
1
-
Total Volume(s)
1
-
Страна
-
Регион
-
Дата раскрытия информации
2010/06/18
-
Disclosure Status
Disclosed
-
Название документа
China - Yantan Hydroelectric Project
-
Ключевые слова
Internal Economic Rate of Return;Special Board of Consultants;Accounting and Financial Management Information System;kv transmission line;Project Preparation and Appraisal;high concrete gravity dam;Soil and Water Conservation;project design and implementation;transfer of technology;thermal power plant;consumer price index;assessment of outcome;interest during construction;high arch dam;Financial Management System;cash operating cost;standard of living;debt service ratio;power plant operation;average tariff increase;average incremental cost;delivery of gas;resettlement construction budget;transmission and distribution;foreign technical assistance;assessment of risk;air quality control;power demand growth;environmental management program;hydroelectric power plant;Planning and Financial;water conveyance system;water quality monitoring;award of contract;affected resettlement implementation;loss of income;dissolved oxygen levels;reservoir drawdown area;
- Подробнее
Файлы Для Скачивания
ПОЛНЫЙ ОТЧЕТ
Официальная версия документа (может содержать подписи, и т.д.)
- Официальная версия (PDF)
- TXT*
- Total Downloads** :
- Download Stats