The project consists of the expansion of USIMINAS's production facilities from about 1.0 to 2.4 million metric tons of raw steel per year to produce about 1.85 million tons of flat rolled products. The new facilities will include a battery of coke ovens, sintering plant, a blast furnace, a new basic oxygen plant and additions to the existing basic oxygen plant, two continuous slabcasting machines, additions to the existing slabbing mill, a heavy plate...
Подробнее
ПОДРОБНАЯ ИНФОРМАЦИЯ
-
1972/03/31
-
Меморандум и рекомендации Президента
-
P1049
-
1
-
1
-
2010/06/24
-
Disclosed
-
Brazil - Usiminas Steel Expansion Project
-
Internal Economic Rate of Return
ФАЙЛЫ ДЛЯ СКАЧИВАНИЯ
ПОЛНЫЙ ОТЧЕТ
Официальная версия документа (может содержать подписи, и т.д.)