This project, with a total cost of US$ 92.74 million (IDA, the government of Sierra Leone and five other donors) was declared effective in 1993 and closed in 2001, with country operations being suspended in 1998 and 1999 due to the security situation. The main objectives were: (i) to remove physical bottlenecks in the country's transport network through a sustainable road rehabilitation program; (ii) to build institutional capacity to better plan...