The Bank established a specific policy and procedures for environmental assessment and related environmental analyses of International Bank for Reconstruction and Development (IBRD) ) and International Development Association (IDA) lending operations. Under this environmental assessment process, the type, timing, and main issues of environmental analysis to be performed by the borrower are to be confirmed at the time that a given lending operation is initiated into the Banks prospective lending program and thereafter reported and updated on a quarterly basis in the monthly operational summary. This report focuses on the monthly operational summary of Bank as of January 1981.
Подробная Информация
-
Дата подготовки документа
1981/02/12
-
Тип документа
Ежемесячный обзор операционной деятельности
-
Номер отчета
146535
-
Том
1
-
Total Volume(s)
1
-
Страна
-
Регион
-
Дата раскрытия информации
2020/06/09
-
Disclosure Status
Disclosed
-
Название документа
Monthly Operational Summary of Bank and IDA Proposed Projects (as of January 31, 1981)
- Подробнее
Файлы Для Скачивания
ПОЛНЫЙ ОТЧЕТ
Официальная версия документа (может содержать подписи, и т.д.)
- Официальная версия (PDF)
- TXT*
- Total Downloads** :
- Download Stats