Mixed results are conveyed by this project assessment, given its outcome is rated unsatisfactory, with an unlikely sustainability, yet institutional development impacts are substantial, and both performances by the Bank, and Borrower are rated satisfactory. Lessons confirm in fact, that the project succeeded much better than many similar railway projects, with a rising freight traffic over the network of over seventy five percent, having the Tanzania...
Подробнее
ПОДРОБНАЯ ИНФОРМАЦИЯ
-
2003/06/30
-
Отчет о завершении и результатах проекта
-
26232
-
1
-
1
-
2010/07/01
-
Tanzania - Railways Restructuring Project
-
freight traffic
ФАЙЛЫ ДЛЯ СКАЧИВАНИЯ
ПОЛНЫЙ ОТЧЕТ
Официальная версия документа (может содержать подписи, и т.д.)