The following types of activities for the irrigation development additional financing project for Armenia will be mostly implemented during the construction works within the scope of the program: earth works, including soil excavation and backfill; placement of flume canal from r/c flumes type ??-6 on concrete supports; placement of steel pipes; preparation and installation of steel lift gates; and arrangement of joints. The rehabilitation of the...
Подробнее
ПОДРОБНАЯ ИНФОРМАЦИЯ
-
2007/05/03
-
Оценка состояния окружающей среды
-
E1646
-
1
-
1
-
2007/04/27
-
Disclosed
-
Armenia - Irrigation Development Additional Financing Project : environmental assessment
-
Operation and Maintenance of Irrigation