Skip to Main Navigation

Mauritania - Banda Gas-to-Power Guarantee Operation Project : environmental assessment (Vol. 6 of 6) : Étude de faisabilité de la ligne HT Nouakchott-Tobene et des postes HT associés : phase I - Sénégal (Французский)

The objective of the Banda Gas-to-Power Guarantee Operation Project for Mauritania is to involve the drilling and installation of two gas production wells, and their connection to an onshore gas processing facility, via a sub-sea pipeline. Negative impacts include: interference with shipping and navigation of other sea users, loss of access to fishing grounds, water and sediment contamination, discharges of commissioning fluids, noise, impacts to...
Подробнее

ПОДРОБНАЯ ИНФОРМАЦИЯ

  • 2014/03/01

  • Оценка состояния окружающей среды

  • E4276

  • 6

  • 6 (См. все тома)

  • Сенегал, Мавритания, Мали,

  • Western and Central Africa,

  • 2014/04/17

  • Disclosed

  • Étude de faisabilité de la ligne HT Nouakchott-Tobene et des postes HT associés : phase I - Sénégal

ФАЙЛЫ ДЛЯ СКАЧИВАНИЯ

ПОЛНЫЙ ОТЧЕТ

Официальная версия документа (может содержать подписи, и т.д.)

This document is being processed or is not available.