The development objectives of Lowlands Water Development Project for Lesotho are to (i) increase availability of bulk potable water in two priority zones; (ii) increase access to improved water supply services in two priority zones; and (iii) improve operational performance of water and sewerage company (WASCO). Some of the negative impacts include: (i) solid waste disposal; (ii) waste oil or fuel disposal; (iii) noise pollution; (iv) visual impacts; (v) traffic Impacts; (vi) water pollution; and (vii) influx of labour related Impacts. Some of the mitigation measures include: (i) provide adequate waste receptacles facilities at construction camps; (ii) provide drums or containers for temporary storage on site for the oils collected from vehicles and equipment; (iii) adhere to working hours in accordance to the employment act; (iv) geofence the exposed trenches with barrier red tape; (v) establish speed limits; (vi) maintenance and lubricating of vehicles should take place offsite; and (vii) regular sensitization of workers and surrounding communities of the risks of HIV/AIDS and other STDs.
Подробная Информация
-
Автор
Borrowing Agency
-
Дата подготовки документа
2021/10/31
-
Тип документа
Оценка состояния окружающей среды
-
Номер отчета
SFG5122
-
Том
2
-
Total Volume(s)
1
-
Страна
-
Регион
-
Дата раскрытия информации
2021/12/23
-
Disclosure Status
Disclosed
-
Название документа
Addendum to the Environmental and Social Management Framework - Contingent Emergency Relief Component
- Подробнее
Файлы Для Скачивания
ПОЛНЫЙ ОТЧЕТ
Официальная версия документа (может содержать подписи, и т.д.)
- Официальная версия (PDF)
- TXT*
- Total Downloads** :
- Download Stats