Skip to Main Navigation

Uzbekistan - Khorezm Solar IPP Project : Soil, Drainage and Erosion Control Management Plan for Construction Phase (Английский)

The development objective of Khorezm Solar IPP Project is to increase the private sector-led renewable energy supply in Uzbekistan. Some of the mitigation measures include: all relevant personnel will be trained in proper soil management and reinstatement procedures, including soil contamination prevention and erosion control, taking into consideration their level of responsibility and duties; personnel at an appropriate level of seniority will be...
Подробнее

ПОДРОБНАЯ ИНФОРМАЦИЯ

  • 2024/04/01

  • Оценка состояния окружающей среды

  • 193792

  • 1

  • Узбекистан,

  • Европа и Центральная Азия,

  • 2024/10/01

  • Disclosed

  • Uzbekistan - Khorezm Solar IPP Project : Soil, Drainage and Erosion Control Management Plan for Construction Phase

ФАЙЛЫ ДЛЯ СКАЧИВАНИЯ

ПОЛНЫЙ ОТЧЕТ

Официальная версия документа (может содержать подписи, и т.д.)

This document is being processed or is not available.