This Report compiles the key findings from multiple technical studies carried out under this TA and is structured as follows: Section A summarizes key gaps in the current practices of the DRB management with emphasis on hydropower development and the recommendations in addressing those gaps. Section B summarizes gaps in the feasibility assessment of the Buk Bijela and Foca HPPs. The utility Elektroprivreda Republike Srpske (ERS) in BiHproposed to...
Подробнее
ПОДРОБНАЯ ИНФОРМАЦИЯ
-
2021/09/30
-
Доклад/ отчет
-
167091
-
1
-
2021/12/16
-
Disclosed
-
2021/12/16
-
Technical Assistance on Integrated Water and Hydropower Development in the Drina River Basin Overall Summary
ФАЙЛЫ ДЛЯ СКАЧИВАНИЯ
ПОЛНЫЙ ОТЧЕТ
Официальная версия документа (может содержать подписи, и т.д.)