Ratings for the Integrated Transport Project for Botswana were as follows: outcome was moderately satisfactory, Bank performance was moderately unsatisfactory, and monitoring and evaluation (M and E) quality was negligible. Some lessons learned included: capacity development for the client should be better integrated into the project design to ensure that the client can institutionalize the relevant training and adequately take over new systems post...
Подробнее
ПОДРОБНАЯ ИНФОРМАЦИЯ
-
2023/02/28
-
Отчет о завершении и результатах проекта
-
ICR5871
-
1
-
2023/02/27
-
Disclosed
-
Botswana - Integrated Transport Project