Skip to Main Navigation

Climate Change Technical Note : Bangladesh Bay Terminal Marine Infrastructure Development Project (Английский)

The Project’s largest investment is in the breakwater. The breakwater (sub-component 1a) is planned on an existing sandbar, which already in itself provides protection for the proposed port operations but may not be adequately resilient to ensure continuity of port operations due to the climate exacerbated hazards such as storm surge, cyclones, and sea-level rise. The existing sand bar will be the base case for assessing continuity of port operations...
Подробнее

ПОДРОБНАЯ ИНФОРМАЦИЯ

  • 2024/09/09

  • Рабочие документы

  • 193470

  • 1

  • Бангладеш,

  • Южная Азия,

  • 2024/09/09

  • Disclosed

  • Climate Change Technical Note : Bangladesh Bay Terminal Marine Infrastructure Development Project

This document is being processed or is not available.