Guinea - Urban Water Project (Английский)

Ratings of Urban Water Project for Guinea were as follows: outcome was satisfactory, Bank performance was satisfactory, and monitoring and evaluation quality was substantial. Some of the lessons learned include: Re-engaging Bank support after an extended hiatus necessitates thorough preparation, should consider potential deficiencies in client capacity, willingness to reform the sector, and political instability; Preparation must ensure that the M&E...