Ratings of Urban Water Project for Guinea were as follows: outcome was satisfactory, Bank performance was satisfactory, and monitoring and evaluation quality was substantial. Some of the lessons learned include: Re-engaging Bank support after an extended hiatus necessitates thorough preparation, should consider potential deficiencies in client capacity, willingness to reform the sector, and political instability; Preparation must ensure that the M&E...
Подробнее
ПОДРОБНАЯ ИНФОРМАЦИЯ
-
2024/10/17
-
Отчет о завершении и результатах проекта
-
ICR00141
-
1
-
2024/10/25
-
Disclosed
-
Guinea - Urban Water Project