Transformative Economic Corridors in Norte Grande : Gap Analysis of Access to Electricity by the Productive Sectors (Английский)

In Argentina, electricity transmission is carried out within the framework of the Argentine Interconnection System (Sistema Argentino de Interconexión, SADI). The SADI consists of a set of lines, networks and substations that cover approximately ninety percent of the country's territory. In this report, Task I presents "General Diagnosis" and Task II "Sectorial Diagnosis". Next, within the framework of Task III "Search for Solutions", the sectors...
Подробнее

ПОДРОБНАЯ ИНФОРМАЦИЯ

  • 2024/10/01

  • Рабочие документы

  • 194150

  • 1

  • Аргентина,

  • Латинская Америка и страны Карибского бассейна,

  • 2024/10/16

  • Disclosed

  • Transformative Economic Corridors in Norte Grande : Gap Analysis of Access to Electricity by the Productive Sectors

ФАЙЛЫ ДЛЯ СКАЧИВАНИЯ

ПОЛНЫЙ ОТЧЕТ

Официальная версия документа (может содержать подписи, и т.д.)

This document is being processed or is not available.