Skip to Main Navigation

Bhutan - Development Policy Financing With Catastrophe Deferred Drawdown Option Project (Английский)

Ratings of Development Policy Financing with Catastrophe Deferred Drawdown Option Project for Bhutan were as follows: overall outcome was moderately satisfactory, relevance of prior actions was satisfactory, and achievement of objectives was moderately satisfactory. Some of the lessons learned include: (i) Combining the “traditional Cat DDO” design with the health emergency preparedness was critical both in cross-fertilizing the DRM and health agenda...
Подробнее

ПОДРОБНАЯ ИНФОРМАЦИЯ

  • 2024/05/10

  • Отчет о завершении и результатах проекта

  • ICR6445

  • 1

  • Бутан,

  • Южная Азия,

  • 2024/05/10

  • Disclosed

  • Bhutan - Development Policy Financing With Catastrophe Deferred Drawdown Option Project

This document is being processed or is not available.