Africa - Tanzania-Zambia Transmission Interconnector Project : environmental assessment (Vol. 5 of 4) : Africa - Tanzania-Zambia Transmission Interconnector Project : Environmental and Social Impact Assessment for Bird and Bat Study for the proposed Iringa – Mbeya – Tunduma – Sumbawanga 400kV Overhead Transmission Line (Английский)

The development objective of the Tanzania-Zambia Transmission Interconnector Project for Africa is to establish cross-border transmission capacity between the Southern African Power Pool and the Eastern Africa Power Pool to enable regional power trade. Some of the negative impacts and mitigation measures are includes : (i) prepare and implement erosion and sediment control plans,particularly in areas identified as having high erosion potential; (ii)...
Подробнее

ПОДРОБНАЯ ИНФОРМАЦИЯ

  • 2022/03/11

  • Оценка состояния окружающей среды

  • SFG4014

  • 5

  • 4 (См. все тома)

  • Eastern Africa, Африка,

  • Африка,

  • 2022/04/05

  • Disclosed

  • Africa - Tanzania-Zambia Transmission Interconnector Project : Environmental and Social Impact Assessment for Bird and Bat Study for the proposed Iringa – Mbeya – Tunduma – Sumbawanga 400kV Overhead Transmission Line

This document is being processed or is not available.