Skip to Main Navigation

Botswana - Morupule B Generation and Transmission Project : environmental assessment (Vol. 11 of 18) : Executive summary of EIA for transmission lines (Setswana)

The objectives of the Morupule B Generation and Transmission Project are to expand domestic power generation capacity that will support sustained economic growth in Botswana; and build institutional capacity for sustainable development of the energy sector. Negative measures include: loss of top soil, ground water pollution due to hydrocarbon spillage, air quality, flora and fauna, and increase in noise pollution during construction. Mitigation measures...
See More

DETAILS


Citation

Digby Wells and Associates; Ecosurv (Pty) Ltd.

Botswana - Morupule B Generation and Transmission Project : environmental assessment (Vol. 11 of 18) : Executive summary of EIA for transmission lines (Setswana). Botswana ; s.n.. http://documents.worldbank.org/curated/en/727011468017370245

This document is being processed or is not available.