Skip to Main Navigation

Iraq - Emergency Operation Development Projects (EODP) : Environmental Assessment (Vol. 13 of 13) : تقييم الإدارة البيئية الاجتماعية المحدودة لمشرو ع جسر صدر النهر في محافظة كركوك : الملخص التنفيذ ي (Arabic)

The development objective of Emergency Operation for Development Project (EODP) for Iraq is to support the country in the reconstruction of damaged infrastructure and the restoration of public services delivery in Targeted Municipal Areas. Some of the negative impacts include : i) emissions of the construction equipment and trucks used to transport construction materials; ii) noise emissions from the equipment engines used during the construction...
See More

DETAILS

  • 2021/06/01

  • Environmental Assessment

  • SFG2335

  • 13

  • 13 (See all volumes)

  • Iraq,

  • Middle East and North Africa,

  • 2021/07/08

  • Disclosed

  • تقييم الإدارة البيئية الاجتماعية المحدودة لمشرو ع جسر صدر النهر في محافظة كركوك : الملخص التنفيذ ي

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

EcoConServ Environmental Solutions.

Iraq - Emergency Operation Development Projects (EODP) : Environmental Assessment (Vol. 13 of 13) : تقييم الإدارة البيئية الاجتماعية المحدودة لمشرو ع جسر صدر النهر في محافظة كركوك : الملخص التنفيذ ي (Arabic). Iraq : EcoConServ Environmental Solutions. http://documents.worldbank.org/curated/en/290671625745278541

This document is being processed or is not available.