Skip to Main Navigation

Pakistan - First Phase of the Dasu Hydropower Project : Environmental Assessment (Vol. 3 of 3) : ماحولیاتی اور سماجی اثرات کی تجزیہ کار : مختصر خلاصہ (Urdu)

The development objective of the First Phase of the Dasu Hydropower Project for Pakistan is to facilitate the expansion of electricity supply of hydro-power in Pakistan. Some of the negative impacts and mitigation measures include: (1) contractor will take extra measures to prevent fuel and other hazardous material spillage; (2) contractor will ensure zero disposal of spoils in the water bodies and take measures to prevent water pollution; (3) proper...
See More

Document also available in : English, English

DETAILS

  • 2019/11/01

  • Environmental Assessment

  • SFG5884

  • 3

  • 3 (See all volumes)

  • Pakistan,

  • South Asia,

  • 2019/11/22

  • Disclosed

  • ماحولیاتی اور سماجی اثرات کی تجزیہ کار : مختصر خلاصہ

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

National Transmission and Dispatch Company.

Pakistan - First Phase of the Dasu Hydropower Project : Environmental Assessment (Vol. 3 of 3) : ماحولیاتی اور سماجی اثرات کی تجزیہ کار : مختصر خلاصہ (Urdu). Pakistan : National Transmission and Dispatch Company. http://documents.worldbank.org/curated/en/131221574658268887

This document is being processed or is not available.