DETAILS
-
2023/09/01
-
Environmental Assessment
-
SFG7342
-
1
-
2024/03/07
-
Disclosed
-
Argentina - Metropolitan Buenos Aires Urban Transformation Project : Final Environmental and Social Plan for Construction and Equipment of Urban Space in the Lower Highway Sector at Barrio Padre Carlos Mugica
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Borrowing Agency.
Argentina - Metropolitan Buenos Aires Urban Transformation Project : Final Environmental and Social Plan for Construction and Equipment of Urban Space in the Lower Highway Sector at Barrio Padre Carlos Mugica (Spanish). Argentina : Borrowing Agency. http://documents.worldbank.org/curated/en/099030724150568726